Dynapac assisted the south extension construction of Ningbo Airport Road during Labor Day in order to recover the impact of the Covid-19 pandemic on the construction period. The project was highly recognized and praised by the clients from Ningbo Municipal Engineering.
Project starts from the exit of Yinzhou district avenue of Ningbo Expressway in the north and ends at Yuelin East Road of Fenghua district in the south, with a total length of about 18.8km.
For this project, Ningbo dealer mobilized the most sophisticated equipment with a full set of Dynapac road construction equipment, including asphalt Paver SD2530CSH, F3030C, two large Rollers CC6200 and one small Roller CC1300. Dynapac has achieved the field task with all its strength in a short period of time with excellent performance and reliable quality. The construction quality of the project has been highly praised by Ningbo Municipal Department and the client!
Dynapac people are using high-quality and advanced road building technology to create brilliance!